Finished apartment kitchen in St. George with gray painted cabinets and new LVP flooring after the remodel

St. George, UT · Whole Home Remodel

Full Apartment Remodel in St. George, Utah

A dated St. George apartment refreshed end to end without moving a wall: honey oak cabinets spray-painted gray, new LVP through every room and down the stairs, fresh paint throughout, and every worn fixture replaced, including ceiling fans, bathroom fixtures, a stairwell chandelier, and the water heater.

Location
St. George, UT · Washington County
Service
Whole Home & Multi-Room Remodeling
Property type
Residential

Painted

Cabinets

Honey oak to gray, spray-applied

New LVP

Flooring

Every room plus the stairs

All Updated

Fixtures

Fans, bath fixtures, chandelier, water heater

St. George

Location

Washington County, Utah

What the customer called us about

The apartment had been lived in for years without meaningful updates. Honey oak cabinets in the kitchen, carpet on the stairs, old ceiling fans, dated bathroom fixtures, and a water heater that had seen better days. The bones were fine; the finishes just had not kept up.

The goal was not a gut remodel. It was a thoughtful, coordinated refresh: update every surface that shows, replace every fixture that is worn, and leave the apartment looking like a different place without tearing out walls.

What Viking did

  • Masked and protected the kitchen, floors, and fixtures before any spraying
  • Removed the cabinet doors and spray-painted the cabinets from honey oak to gray for a factory-quality finish
  • Installed new LVP flooring in every room and on the stairs
  • Painted the apartment throughout
  • Replaced ceiling fans, bathroom fixtures, and the stairwell chandelier
  • Replaced the water heater as part of the coordinated scope
  • Hauled out demo debris and old materials
  • Sequenced every trade so no crew undid the previous crew's work

Photographs from the job

Original photos taken by Viking Solutions on site in St. George.

During the work

Kitchen fully masked with plastic and paper before cabinet spray painting
Everything masked before the sprayer came out.
Second view of the masked kitchen during the cabinet painting phase
Protection is the phase nobody photographs on purpose. It is why the finish came out clean.
Cabinet doors removed and freshly spray-painted gray, drying flat
Doors off and sprayed flat, which is what gives a factory-quality surface.
Viking crew hauling demo debris and old materials out of the apartment
Old materials out.

Finished

Wide view of the finished kitchen with gray cabinets, new counters area, and consistent LVP flooring
The kitchen after, wide.
Finished kitchen opening into the living area with one continuous LVP floor
One floor running kitchen to living area makes the space feel larger.
Refreshed bathroom with new fixtures after the apartment remodel
The bathroom with its new fixtures.
New chandelier hung in the apartment stairwell after the remodel
The new stairwell chandelier.

Detail

Detail of new LVP flooring installed on the apartment stairs replacing old carpet
LVP on the stairs where the old carpet was.

Sequence is everything on a multi-trade job

Paint before flooring. Flooring before baseboards. Fixtures after paint. Water heater before the walls close up. When trades overlap in the wrong order, you end up with scuffed floors, paint on new fixtures, and rework that costs more than doing it right the first time. Managing that sequence is exactly what Viking is there for.

The other quiet discipline was protection: surfaces fully covered before any spray work, floors protected until the flooring phase, so each phase finished without creating cleanup work for the next one.

Materials and products used

Cabinet paint

Doors removed, surfaces sanded and primed, spray-applied gray over honey oak

Luxury vinyl plank flooring

Run through every room and down the stairs for one consistent floor

New fixtures

Ceiling fans, bathroom fixtures, and a stairwell chandelier

Water heater

Replaced as part of the project scope

The result

The same apartment, a completely different feel: new flooring, painted cabinets, fresh fixtures, and consistent finishes throughout, without a single wall being moved.

The result looks like a remodel but cost significantly less, because the scope was right-sized to what the space actually needed.

Worth knowing

If the cabinet boxes are solid and the layout works, painting is often the right call. Sanded, primed, and spray-applied, painted cabinets look as clean as new ones. Brush-rolling cabinets in place rarely looks good; spray-painting removed doors does.

Questions about this kind of work

Can you paint cabinets without replacing them?

Yes, and in many cases it is the right choice. If the cabinet boxes are solid, the layout works, and the doors are in good shape, painting is a cost-effective way to completely change the look of a kitchen. The key is proper prep: doors removed, surfaces sanded and primed, and paint applied by spray rather than brush.

What is the difference between a refresh and a remodel?

A refresh updates finishes, fixtures, and surfaces without changing the layout or structure. A remodel changes the layout, moves walls, or significantly alters the function of a space. Refreshes are typically faster and less expensive, and for many apartments and homes they are exactly what is needed to make the space feel new again.

How long does a full apartment refresh take?

A project like this one, with flooring, cabinet painting, paint throughout, fixtures, and a water heater, typically takes two to three weeks depending on the size of the unit and how many trades need to coordinate. Viking manages the schedule so trades do not overlap in ways that create rework.

Do you work on rental properties?

Yes. Viking works with both homeowners and property owners on rental units, investment properties, and owner-occupied homes. The process is the same: clear scope, honest pricing, and clean work.

Do you handle water heater replacement?

Water heater replacement can be included as part of a larger remodel project. Depending on scope and local requirements, Viking coordinates with a licensed plumber to handle removal and installation to code.

Have something similar at your place?

Tell us what is going on and we will give you a clear scope and a clear quote before any work begins.

Viking Solutions · St. George, Washington County, and Southern Utah

Project documented and published by Viking Solutions STG, a licensed, bonded, and insured contractor in St. George, Utah. Photographs are original and were taken on this job.

Published · Details last verified