St. George, UT · Drywall
A framed storage room inside a St. George garage got its walls: drywall hung inside and out, seams taped and mudded across multiple visits so each coat could dry, then spray texture to match a finished interior look. Floors and the surrounding garage stayed protected the whole way.
3
Documented Visits
November 14 to 25, 2025
Spray Texture
Finish
Interior and exterior faces plus ceiling
St. George
Location
Washington County, Utah
A new storage room had been framed into the corner of the garage, but framing alone is not a room. It needed drywall hung on both faces, the seams finished, and a texture that would let it read as part of the house instead of a plywood box.
The garage was in daily use, so the work had to happen without turning the whole space into a construction zone.
Original photos taken by Viking Solutions on site in St. George.
Before

During the work


The photo dates on this job tell the honest story of drywall work: board hung and first coats on November 14, later coats on November 24, texture on November 25. Mud has to dry before the next coat goes over it, and a finisher who stacks wet coats to save trips leaves you with cracks and shrink lines a few months later.
The other discipline on this job was containment. Spray texture goes everywhere it is allowed to. The door and surrounding garage were masked off with film, and the floor stayed papered from the first day, so a finished room did not come at the cost of a repainted garage.
Drywall sheets
Hung on both faces of the framed room, with electrical box cutouts
Joint tape and compound
Built up in coats across separate visits, sanded between passes
Spray texture
Applied over masked surroundings to match a standard interior wall finish
Floor and masking protection
Builder paper taped to the slab plus film masking before texture
The framed corner of the garage is now a real room: finished walls inside and out, a finished ceiling, and texture ready for paint.
The rest of the garage came through clean because it was protected before the messy stages started, not after.
Worth knowing
When a drywall bid seems slow because it spans several visits, that is usually the honest bid. Coats that dry properly are what keep the seams invisible a year later.
Because joint compound has to dry between coats. This room was taped and coated on the first visit, built up on a later visit, and textured on the final one. Stacking wet coats in a single day is faster and produces seams that crack and shadow within months.
Yes. On this job the storage room was already framed inside the garage, and Viking handled everything from bare studs to textured walls: hanging, taping, mudding, and spray texture on both faces plus the ceiling.
Protection goes down before the mess exists. The floor was covered with taped builder paper from day one, and before texture was sprayed the surrounding garage and door were masked with film. Texture overspray is nearly impossible to remove from bare concrete, so prevention is the whole strategy.
Tell us what is going on and we will give you a clear scope and a clear quote before any work begins.