Tile Demo and Wood-Look Plank Tile Installation

Full tile demo and new wood-look plank tile installation across a hallway, laundry room, and two bathrooms in a St. George home. Old tile out, clean subfloor, fresh tile in, with the same layout and grout color running through every room.

Location
St. George, UT · Washington County
Service
Tile Demolition & Installation
Property type
Residential

4

Rooms Completed

Hallway, laundry, two bathrooms

Plank

Tile Format

Wood-look, warm gray tone

Full Demo

Approach

Down to subfloor, properly prepped

St. George

Location

Washington County, Utah

What the customer called us about

The homeowner had outdated tile through the main living areas: hallway, laundry room, and both bathrooms. It was not only cosmetic. The tile was cracked in places, the grout was stained, and the overall look made the home feel older than it was.

They wanted one consistent floor through the whole area rather than a patchwork of rooms done at different times.

What Viking did

  • Full tile demo in the hallway, laundry room, and two bathrooms
  • Old tile chiseled out with a rotary hammer and vacuum dust collection to keep dust contained
  • Subfloor cleaned and inspected for soft spots and high points before any new material was staged
  • Wood-look plank tile set in a staggered offset pattern so grout lines align through doorways and transitions
  • Tile spacers and blue tape used to hold the layout consistent from room to room
  • All cuts made at a dedicated tile saw station set up in the garage, keeping the mess out of the living areas
  • Grout applied and sealed after the tile set and cured
  • Toilet pulled for the bathroom install and reset on completion

Photographs from the job

Original photos taken by Viking Solutions on site in St. George.

During the work

Viking Solutions crew member using a rotary hammer to break out old tile during demolition in a St. George home
Demo phase. Old tile chiseled out with a rotary hammer rather than smashed, to protect the surrounding surfaces.
Close-up of a rotary hammer chisel lifting old tile off the subfloor with vacuum dust collection attached
Vacuum dust collection on the demo tool kept airborne dust out of the rest of the house.
Installer setting wood-look plank tile into thinset mortar with tile spacers in place
Setting plank tile into thinset, with spacers holding the staggered offset layout.
Wood-look plank tile installation in progress with blue layout tape holding the pattern across the entry
Blue tape held the pattern true while the mortar set.

Finished

Finished hallway with an arched doorway and new wood-look plank tile continuing through to the laundry room
The tile runs continuously through the arched doorway, so the hallway and laundry room read as one space.
Finished laundry room floor with new wood-look plank tile replacing cracked original tile
The laundry room replaced cracked and stained flooring that had been in place since the home was built.
Finished bathroom floor in warm gray plank tile beside a white vanity with black hardware
The warm gray tone works with the white vanity and black hardware without competing with them.

Detail

New plank tile cut and fit tightly around a reset toilet base with clean grout lines
Tile cut and fit around the toilet base. The toilet was pulled for the install and reset on completion.

On site

Tile cutting and prep station set up in the garage with a wet saw and stacked plank tile
All cuts happened at a dedicated station in the garage, which kept the dust and water out of the living areas.

The prep is what decides how long a tile floor lasts

Tile demo is loud, dusty, and physically demanding, but the work before the first new tile gets set is what determines how well the finished floor holds up. A rotary hammer with vacuum collection pulled the old tile cleanly instead of shattering it across the room, which protected the surrounding surfaces and kept dust out of the rest of the house.

Every room was cleared, the subfloor inspected for soft spots or high points, and the surface cleaned before staging any material. Skipping that step is how tile ends up hollow-sounding or cracked a year later.

The job ran in phases so the home stayed livable. Dust containment, daily cleanup, and careful sequencing kept the homeowner out of a construction zone longer than necessary.

Materials and products used

Wood-look plank tile

Warm gray tone, plank format, run in a staggered offset pattern to read like hardwood

Thinset mortar

Mixed and applied in manageable sections to keep full coverage under every tile

Grout and sealer

Applied after the tile cured, single grout color across all four rooms

Tile spacers and layout tape

Held grout lines aligned through doorways and room transitions

The result

The same tile, the same layout, and the same grout color now run through the hallway, laundry room, and both bathrooms, so the floor plan reads as one intentional space instead of rooms finished one at a time.

The warm gray plank works with the white vanity and black hardware in the bathroom without competing with it, and the continuous run through the arched hallway doorway makes the area feel larger than the old tile did.

Worth knowing

If you are replacing tile in more than one room, do them in a single run with one layout and one grout color. Matching a floor later is harder and more expensive than doing it together the first time.

Questions about this kind of work

Can new tile be installed over old tile?

Sometimes, but it was not the right call here. Layering over cracked tile carries the old problem into the new floor and raises the finished height enough to cause issues at doorways and appliances. On this job Viking demoed everything down to the subfloor and prepped the surface first.

Does the toilet have to come out to tile a bathroom floor?

Yes, if you want it done properly. Tiling around a toilet leaves a visible cut line and traps dirt at the base. Viking pulls the toilet, tiles the full floor, and resets the toilet with a new wax ring when the tile has cured.

How do you keep tile demo dust out of the rest of the house?

A rotary hammer with vacuum dust collection catches most of it at the source, and the work area is contained and cleaned daily. Cuts were also made at a saw station in the garage instead of inside the living space.

Should tile in connected rooms be done at the same time?

It is usually worth it. Doing the hallway, laundry room, and bathrooms in one run let Viking hold a single layout, a single grout color, and aligned grout lines through every doorway. Matching a floor later, after the run has been discontinued, is harder and more expensive.

Have something similar at your place?

Tell us what is going on and we will give you a clear scope and a clear quote before any work begins.

Viking Solutions · St. George, Washington County, and Southern Utah

Project documented and published by Viking Solutions STG, a licensed, bonded, and insured contractor in St. George, Utah. Photographs are original and were taken on this job.

Published · Details last verified